Published June 1, 2009 | Version v1
Report

Sulfur Iodine Process Summary for the Hydrogen Technology Down-Selection: Process Performance Package

Description

This document describes the details of implementing a Sulfur-Iodine (S-I) hydrogen production plant to deploy with the Next General Nuclear Power Plant (NGNP). Technical requirements and specifications are included, and a conceptual plant design is presented. The following areas of interest are outlined in particular as a baseline for the various technology comparisons: (1) Performance Criteria - (a) Quantity of hydrogen produced, (b) Purity of hydrogen produced, (c) Flexibility to serve various applications, (d) Waste management; (2) Economic Considerations - (a) Cost of hydrogen, (b) Development costs; and (3) Risk - (a) Technical maturity of the S-I process, (b) Development risk, (c) Scale up options.

Additional details

Publishing Information

Imprint Pagination
26 p.
Report number
INL/EXT--12-25772

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43127587
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S08: HYDROGEN; S42: ENGINEERING;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DESIGN; ECONOMICS; FLEXIBILITY; HYDROGEN; HYDROGEN PRODUCTION; IODINE; NUCLEAR POWER PLANTS; PERFORMANCE; SPECIFICATIONS; SULFUR; WASTE MANAGEMENT
Descriptors DEC
ELEMENTS; HALOGENS; MANAGEMENT; MECHANICAL PROPERTIES; NONMETALS; NUCLEAR FACILITIES; POWER PLANTS; TENSILE PROPERTIES; THERMAL POWER PLANTS

Optional Information

Contract/Grant/Project number
AC07-05ID14517
Notes
doi 10.2172/1047206
Funding organization
DOE - NE (United States)