Published April 26, 1999 | Version v1
Journal article

Completion of the ATLAS control system upgrade

Creators

  • 1. Physics Division, Argonne National Laboratory, Argonne, Illinois 60439 (United States)

Description

In the fall of 1992 at the SNEAP (Symposium of North Eastern Accelerator Personnel) a project to upgrade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported (1). Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still serving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
473
Journal Issue
1
Journal Page Range
p. 258-266
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
8. international conference on heavy-ion accelerator technology
Dates
5-9 Oct 1998
Place
Argonne, IL (United States)

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
40075985
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ATLAS SUPERCONDUCTING LINAC; BEAM MONITORING; BEAM MONITORS; CONTROL SYSTEMS; ION BEAMS; REVIEWS
Descriptors DEC
ACCELERATORS; BEAMS; DOCUMENT TYPES; HEAVY ION ACCELERATORS; HILACS; LINEAR ACCELERATORS; MEASURING INSTRUMENTS; MONITORING; MONITORS

Optional Information

Notes
(c) 1999 American Institute of Physics.