Published May 24, 1977
| Version v1
Report
Open
Mark I 1/5-scale boiling water reactor pressure suppresion experiment quick-look report
Description
This report is intended as a ''quick-look'' report summarizing the experimental results obtained from pressure suppression experiment numbers 2.1, 2.2, and 2.3 that were performed on the Lawrence Livermore Laboratory's 1/5-scale boiling water reactor (BWR) Mark I pressure suppression experimental facility on April 26, 1977. A brief description of the general nature of the tests and a summary of the actual tests that were performed are given
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01.Files
8343478.pdf
Files
(1.5 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:1fb36610b6270057cc2fb97c2f67377c
|
1.5 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 98 p.
- Report number
- UCID--17446-3
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 8343478
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BWR TYPE REACTORS; CONTAINMENT SYSTEMS; MOCKUP; PERFORMANCE TESTING; PRESSURE SUPPRESSION
- Descriptors DEC
- CONTAINMENT; REACTORS; STRUCTURAL MODELS; TESTING; WATER COOLED REACTORS; WATER MODERATED REACTORS