Published May 24, 1977 | Version v1
Report Open

Mark I 1/5-scale boiling water reactor pressure suppresion experiment quick-look report

Description

This report is intended as a ''quick-look'' report summarizing the experimental results obtained from pressure suppression experiment numbers 2.1, 2.2, and 2.3 that were performed on the Lawrence Livermore Laboratory's 1/5-scale boiling water reactor (BWR) Mark I pressure suppression experimental facility on April 26, 1977. A brief description of the general nature of the tests and a summary of the actual tests that were performed are given

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01.

Files

8343478.pdf

Files (1.5 MB)

Name Size Download all
md5:1fb36610b6270057cc2fb97c2f67377c
1.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
98 p.
Report number
UCID--17446-3