In this leaflet the short history of commissioning of Bohunice V-2 NPP is reviewed (beginning of construction December 1976; First controlled reactor power, Reactor Unit 1 (RU1): 7 August 1984, Reactor Unit 2 (RU2): 2 August 1985; Connection to the grid: RU1 20 August 1984, RU2 9 August 1985; Commercial operation: RU1 14 February 1985, RU2 18 December 1985. The scheme of the nuclear reactor WWER 440/V213 is depicted. The major technological equipment are described. Principles of nuclear power plant operation safety (safety barriers, active and passive safety systems, centralized heat supply system, as well as technical data of the Bohunice V-2 NPP are presented

Availability note (English)

Available from INIS in electronic form

Files

31062525.pdf

Files (1.1 MB)

Name Size Download all
md5:1dae38bc4df2f7f42a6aef57a86befa3
1.1 MB Preview Download

Additional details

Additional titles

Original title (Slovak)
Jadrova elektraren V-2

Publishing Information

Publisher
Atomove elektrarne Bohunice
Imprint Place
Jaslovske Bohunice (Slovakia)
Imprint Pagination
8 p.
Report number
INIS-SK--00-038

Optional Information

Notes
9 figs., 1 tab.