Published August 1994 | Version v1
Report Open

Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

Description

The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95004971; NTIS; US Govt. Printing Office Dep.

Files

26045489.pdf

Files (641.0 kB)

Name Size Download all
md5:c943abd0a9895dab95810f7711d7bf3b
641.0 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
22 p.
Report number
WHC-SD--WM-WP-284

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).