Published September 1991 | Version v1
Report Open

Identification and assessment of containment and release management strategies for a BWR Mark I containment

  • 1. Brookhaven National Lab., Upton, NY (United States)

Description

This report identifies and assesses accident management strategies which could be important for preventing containment failure and/or mitigating the release of fission products during a severe accident in a BWR plant with a Mark 1 type of containment. Based on information available from probabilistic risk assessments and other existing severe accident research, and using simplified containment and release event trees, the report identifies the challenges a Mark 1 containment could face during the course of a severe accident, the mechanisms behind these challenges, and the strategies that could be used to mitigate the challenges. A safety objective tree is developed which provides the connection between the safety objectives, the safety functions, the challenges, and the strategies. The strategies were assessed by applying them to certain severe accident sequence categories which have one or more of the following characteristics: have high probability of core damage or high consequences, lead to a number of challenges, and involve the failure of multiple systems. 59 refs., 55 figs., 27 tabs

Availability note (English)

MF available from INIS under the Report Number; OSTI as TI92000521; NTIS; INIS; GPO.

Files

23011299.pdf

Files (15.4 MB)

Name Size Download all
md5:b64b3bf839ae60add8c0e1f4a5d0946d
15.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
208 p.
Report number
NUREG/CR--5634

Optional Information

Contract/Grant/Project number
Contract AC02-76CH00016
Funding organization
Nuclear Regulatory Commission, Washington, DC (United States).
Secondary number(s)
BNL-NUREG--52259.