Published 2005 | Version v1
Miscellaneous Open

Problems arising during the construction of small Water Power Stations

Creators

  • 1. National Electricity Company JSC, Sofia (Bulgaria)

Description

Today, under market economy conditions and liberated from initiative restrictions, Bulgarians demonstrate extremely big activity in construction of small, private Hydro Power Stations. It appears that only availability of means and desire for HPS construction is not sufficient. Information about many issues is necessary, especially for availability and features of potentially energetic locations and either their work load or their utilization till this moment. (author)

Availability note (English)

Available from INIS in electronic form

Files

36071559.pdf

Files (1.4 MB)

Name Size Download all
md5:384e1dcf4f2bcbefe21f46882a9f5495
1.4 MB Preview Download

Additional details

Additional titles

Original title (Bulgarian)
Problemi vyzniknvashti pri izgrazhdaneto na malki vodno-elektricheski tsentrali

Publishing Information

Imprint Pagination
3 p.
Report number
INIS-BG--0927

Conference

Title
Energy Forum'2004
Dates
11-13 Jun 2004
Place
Varna (Bulgaria)

INIS

Country of Publication
Bulgaria
Country of Input or Organization
Bulgaria
INIS RN
36071559
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BULGARIA; HYDROELECTRIC POWER; HYDROLOGY; LICENSES; PLANNING; PROPERTY RIGHTS; SMALL-SCALE HYDROELECTRIC POWER PLANTS; TECHNOLOGY UTILIZATION
Descriptors DEC
DEVELOPING COUNTRIES; EASTERN EUROPE; ELECTRIC POWER; ENERGY SOURCES; EUROPE; HYDROELECTRIC POWER PLANTS; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES