Published May 2021
| Version v1
Report
Experiences of Member States with Ageing Management during Delayed Construction: India. Description of the Plant(s)
Creators
Description
Historical Aspects: Both units were in extended shutdown stage for en-masse coolant channel replacement for above mentioned period. KAPS–1 restarted after an outage period of 3 years. The replaced coolant channels have shown degradation in outer diameter and failure due to formation of nodules. En-masse coolant channel replacement was again taken up for the same unit. KAPS– 1 has restarted in 2018 and KAPS –2 restarted in June 2019. The ageing management practices followed are the same in both units. General details of plant life management procedures can be found elsewhere.
Additional details
Identifiers
Publishing Information
- ISBN
- 978-92-0-107921-3
- Imprint Title
- Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning
- Imprint Pagination
- 129 p.
- Journal Page Range
- p. 82-89
- ISSN
- 1011-4289
- Report number
- IAEA-TECDOC--1957
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 52070550
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AGING; CONSTRUCTION; COOLANTS; HISTORICAL ASPECTS; INDIA; KAKRAPAR-1 REACTOR; KAKRAPAR-2 REACTOR; OUTAGES; PROGRAM MANAGEMENT; REACTOR SHUTDOWN; TIME DELAY
- Descriptors DEC
- ASIA; CANDU TYPE REACTORS; DEVELOPING COUNTRIES; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; MANAGEMENT; NATURAL URANIUM REACTORS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTOR LIFE CYCLE; REACTORS; SHUTDOWN; THERMAL REACTORS
Optional Information
- Notes
- 2 tabs.