Published 1989
| Version v1
Journal article
A nomogram of the economic effectiveness of the V-1 nuclear power plant life extension
Creators
Description
Economic assessment is presented of the concept variants for extending the life of the V-1 nuclear power plant after its reconstruction. The starting assumption is that in 1995 the units of this nuclear power plant will be shut down for reconstruction with the aim to increase the technological safety and for updating and renewing the equipment and circuits. The variant parameters in the evaluation were the shutdown time for the reconstruction, the reconstruction costs, and the year of terminating the plant operation after its reconstruction. A nomogram for determining the specific annual updated costs after extending the life of the power plant units and a table listing these costs are given. (P.A.). 2 figs., 1 tab
Additional details
Additional titles
- Original title (Slovak)
- Nomogram ekonomickej efektivnosti predlzenia zivotnosti jadrovej elektrarne (JE) V1
Publishing Information
- Journal Title
- Zpravodaj VUPEK
- Journal Issue
- no.3
- Series
- Zpr. VUPEK.
- CODEN
- ZVPKE
INIS
- Country of Publication
- Serbia and Montenegro
- Country of Input or Organization
- Serbia and Montenegro
- INIS RN
- 21095043
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BOHUNICE V-1 REACTOR; CONSTRUCTION; COST BENEFIT ANALYSIS; LIFETIME; MODIFICATIONS; NOMOGRAMS; NUCLEAR POWER PLANTS; OPTIMIZATION; PLANNING; REACTOR SHUTDOWN
- Descriptors DEC
- DIAGRAMS; ECONOMIC ANALYSIS; ENRICHED URANIUM REACTORS; INFORMATION; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SHUTDOWN; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS