Operation of the SPring-8 SR main magnet power supplies and control system

  • 1. JAERI-RIKEN SPring-8 Project Team, Kamigori, Hyogo (Japan)

Description

After installation of the power supplies (PSs) of the main magnets in the SPring-8 Storage Ring (SR) in 1995, cable connections between the PSs and the magnets were completed in October of 1996. The final test operation and inspection of current stability, ripple measurement and control, interlock sequence and operation program were successfully carried out by March of 1996. During the SR beam commissioning and operations for the beam line users from March to July of 1997, the magnet power supply were operated successfully. (author)

Part of:
Proceedings of the 11th symposium on accelerator science and technology

Additional details

Publishing Information

Publisher
Japan Synchrotron Radiation Research Inst, JASRI
Imprint Place
Kamigori, Hyogo (Japan)
Imprint Title
Proceedings of the 11th symposium on accelerator science and technology
Imprint Pagination
563 p.
Journal Page Range
p. 395-398

Conference

Title
11. symposium on accelerator science and technology
Dates
21-23 Oct 1997
Place
Kamigori, Hyogo (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
30002295
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BENDING MAGNETS; BEAM FOCUSING MAGNETS; CONTROL SYSTEMS; INTERLOCKS; NOISE; OPERATION; POWER SUPPLIES; SPRING-8 STORAGE RING; STABILITY; START-UP
Descriptors DEC
ELECTRONIC EQUIPMENT; EQUIPMENT; MAGNETS; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES

Optional Information