Published 1989 | Version v1
Miscellaneous

The remote installation of instrumentation for on-line reactor monitoring

  • 1. Central Electricity Generating Board, Manchester (UK)

Description

Applications are described of instrument technology in the on-line measurement of two aspects of Magnox reactor performance: the first is the off-load installation of displacement transducers for the continuous monitoring of the core restraint and the second is the temporary installation on-load of a channel flow anemometer. (author). 10 figs., 1 ref

Part of:
Proceedings of the IAEA Specialists' Meeting on experience and further improvement of in-service inspection methods and programmes of NPPs with particular emphasis on on-line techniques

Additional details

Publishing Information

Imprint Title
Proceedings of the IAEA Specialists' Meeting on experience and further improvement of in-service inspection methods and programmes of NPPs with particular emphasis on on-line techniques
Imprint Pagination
445 p.
Journal Page Range
p. 277-286.
Report number
INIS-mf--12814

Conference

Title
IAEA specialists' meeting on experience and further improvement of in-service inspection methods and programmes of NPPs with particular emphasis on on-line techniques.
Dates
5-9 Jun 1989.
Place
Plzen (Czechoslovakia).

INIS

Country of Publication
Serbia and Montenegro
Country of Input or Organization
Serbia and Montenegro
INIS RN
22038397
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
FLOWMETERS; GAS FLOW; IN CORE INSTRUMENTS; MAGNOX TYPE REACTORS; ON-LINE MEASUREMENT SYSTEMS; POSITIONING; REACTOR CORE RESTRAINTS; REACTOR MONITORING SYSTEMS; SPECIFICATIONS; TRANSDUCERS
Descriptors DEC
FLUID FLOW; MEASURING INSTRUMENTS; NATURAL URANIUM REACTORS; ON-LINE SYSTEMS; POWER REACTORS; REACTOR PROTECTION SYSTEMS; REACTORS; RESTRAINTS

Optional Information