Published 1997 | Version v1
Report Restricted

Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site

Description

Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab

Availability note (English)

Available from INIS in electronic form and/or on microfiche ; Also available from OSTI as DE97003098; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
LA-UR--96-4822

Conference

Title
7. international conference on creep and fracture of engineering materials and structure.
Dates
3-14 Aug 1997.
Place
Los Angeles, CA (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
29006492
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Resource subtype / Literary indicator
Conference
Descriptors DEI
HIGH-LEVEL RADIOACTIVE WASTES; PLUTONIUM; PROGRAM MANAGEMENT; ROCKY FLATS PLANT
Descriptors DEC
ACTINIDES; ELEMENTS; MANAGEMENT; MATERIALS; METALS; NATIONAL ORGANIZATIONS; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; TRANSURANIUM ELEMENTS; US AEC; US DOE; US ERDA; US ORGANIZATIONS; WASTES

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-36
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-970803--3.