Published July 1988 | Version v1
Report Restricted

Method for consequence calculations for severe accidents

Description

This report was commissioned by the Swedish State Power Board. The report contains a calculation of radiation doses in the surroundings caused by a theoretical core meltdown accident at Forsmark reactor No 3. The accident sequence chosen for the calculating was a release caused by total power failure. The calculations were made by means of the PLUCON4 code. Meteorological data for two years from the Forsmark meteorological tower were analysed to find representative weather situations. As typical weather, Pasquill D was chosen with a wind speed of 5 m/s, and as extreme weather, Pasquill F with a wind speed of 2 m/s. 23 tabs., 37 ills., 20 refs. (author)

Availability note (English)

Also available from Risoe Library, DK-4000 Roskilde.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Subtitle (English)
Release from Forsmark 3 caused by total power failure
Original title (Danish)
Metode for konsekvensberegninger for store havarier
Original subtitle (Danish)
Udslip fra Forsmark 3 foraarsaget af totalt elbortfald og tidlig spraengpladeaabning.

Publishing Information

ISBN
87-550-1435-6
Imprint Pagination
68 p.
Report number
RISO-M--2721

Optional Information

Contract/Grant/Project number
Contract BIT-550540