Published March 1980 | Version v1
Report Restricted

Heavy ion fusion half-year report, October 1, 1979-March 31, 1980

Description

Major elements of the program in the first half of Fiscal Year 1980 included: (1) characterization of the 1 amp, 1 MV, 2 μs beam after acceleration through one pulsed drift tube; (2) observation of current and energy spikes at the onset of the beam pulse occasioned by the unusually long transit-time (approx. 1 μsec) of the mass 133 ions across the diode gap; (3) completion of the full system, comprising of source and three drift-tubes, in February 1980; (4) development of new beam diagnostic probes for high-intensity ion beams; and (5) a major re-direction of the design effort on the Induction Linac Test Bed to bring costs, based on R/D funds that include overhead, down from the 40 million system (described in LBL PUB-5031) to the canonical 25 million

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
40 p.
Report number
LBL--10914

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11556592
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Progress Report
Descriptors DEI
BEAM TRANSPORT; CESIUM IONS; HEAVY ION ACCELERATORS; INERTIAL CONFINEMENT; ION SOURCES; RESEARCH PROGRAMS
Descriptors DEC
ACCELERATORS; ATOMIC IONS; CHARGED PARTICLES; CONFINEMENT; IONS