Heavy ion fusion half-year report, October 1, 1979-March 31, 1980
Description
Major elements of the program in the first half of Fiscal Year 1980 included: (1) characterization of the 1 amp, 1 MV, 2 μs beam after acceleration through one pulsed drift tube; (2) observation of current and energy spikes at the onset of the beam pulse occasioned by the unusually long transit-time (approx. 1 μsec) of the mass 133 ions across the diode gap; (3) completion of the full system, comprising of source and three drift-tubes, in February 1980; (4) development of new beam diagnostic probes for high-intensity ion beams; and (5) a major re-direction of the design effort on the Induction Linac Test Bed to bring costs, based on R/D funds that include overhead, down from the 40 million system (described in LBL PUB-5031) to the canonical 25 million
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 40 p.
- Report number
- LBL--10914
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 11556592
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- BEAM TRANSPORT; CESIUM IONS; HEAVY ION ACCELERATORS; INERTIAL CONFINEMENT; ION SOURCES; RESEARCH PROGRAMS
- Descriptors DEC
- ACCELERATORS; ATOMIC IONS; CHARGED PARTICLES; CONFINEMENT; IONS