Published 1986 | Version v1
Report Restricted

MIDAS [Master Information and Data Acquisition System]

Description

The Master Information and Data Acquisition System (MIDAS) is a computerized work control system that provides 24-hour, real-time access to plant equipment information and work package status. It is used in the 400 Area of the Department of Energy (DOE) Hanford Site in Richland, Washington. MIDAS was originally created to aid in the release and control of work at the Fast Flux Test Facility (FFTF), which is operated by the Westinghouse Hanford Company for the DOE. After MIDAS performed that function at FFTF successfully for over two years, its role was expanded to provide similar functions for other facilities supporting the LMR mission. Through its ability to provide online, accurate information on plant components, safety criteria, and work package status, MIDAS reinforces Operations functions and the control and authorization of maintenance activities in the FFTF plant and in other related facilities. Thus, MIDAS enhances the operational safety, as well as the planning and scheduling process for these facilities. MIDAS consists of three parts: The Plant Tracking System (PTS), the Work Control Log (WCL), and the MIDAS Component Indices

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE87004088.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
HEDL-SA--3381-FP

Conference

Title
Nuclear power plant maintenance meeting.
Dates
23-27 Mar 1986.
Place
Salt Lake City, UT (USA).

Optional Information

Secondary number(s)
CONF-860311--13.