Published 2009 | Version v1
Miscellaneous

Beam tuning of injection and fast extraction of J-PARC MR

  • 1. High Energy Accelerator Research Organization, J-PARC Center, Tokai, Ibaraki (Japan)
  • 2. Japan Atomic Energy Agency, J-PARC Center, Tokai, Ibaraki (Japan)
  • 3. IHEP, Beijing (China)

Description

The beam commissioning of J-PARC MR was started from May 2008 and is in progress. As usual, injection is in the very first stage and strongly related to other parts of MR commissioning including fast extraction to neutrino beam line, where extracted beams finally reflect the overall commissioning result. (author)

Part of:
Proceedings of the 6th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
Dai 6 kai nippon kasokuki gakkai nenkai

Publishing Information

Imprint Title
Proceedings of the 6th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
1177 p.
Journal Page Range
p. 307-309

Conference

Title
6. annual meeting of Particle Accelerator Society of Japan
Dates
5-7 Aug 2009
Place
Tokai, Ibaraki (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
41095821
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM EXTRACTION; BEAM INJECTION; BEAM OPTICS; COMMISSIONING; CONSTRUCTION; INSTALLATION; J-PARC; ORBITS; PROTON BEAMS; TUNING
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; NUCLEON BEAMS; PARTICLE BEAMS; SYNCHROTRONS

Optional Information

Notes
This CD-ROM can be used for WINDOWS, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name: papers, Paper ID: wpbta04.pdf Imprint:Dai 6 kai nippon kasokuki gakkai nenkai