Blowdown transients and implication for leak protection shutdown strategy
Description
The creep-fatigue damage due to a blowdown transient is independent of the rate of water-side blowdown following isolation. The damage depends primarily upon plant system characteristics which set the rate of IHTS sodium cooldown after reactor scram and main pump trip. The time delay between a small leak alarm and reactor scram should be considered as a tradeoff between (1) providing time to confirm the existence of the leak to a reasonable level of assurance and (2) the potential for secondary tube wastage damage. In general, there appears to be no incentive to delay water-side blowdown following scram because the additional stress damage due to blowdown is insignificant and the potential for wastage damage should be eliminated as quickly as possible. One exception is the case of multiple evaporators feeding a superheater (as for CRBRP) where isolation and blowdown of one evaporator shortly after scram can cause significant additional stress damage to the superheater upper tubesheet. When initiated, the water-side blowdown process should be rapid. About 30 seconds blowdown time appears practical and adequate, based on the CRBRP design
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 32 p.
- Report number
- DOE/SF/70030--T45
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 13647761
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY;
- Descriptors DEI
- BLOWDOWN; CLINCH RIVER BREEDER REACTOR; CREEP; FATIGUE; LEAKS; LMFBR TYPE REACTORS; REACTOR PROTECTION SYSTEMS; SCRAM; STEAM GENERATORS
- Descriptors DEC
- BOILERS; BREEDER REACTORS; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; LIQUID METAL COOLED REACTORS; MECHANICAL PROPERTIES; POWER REACTORS; REACTOR SHUTDOWN; REACTORS; SODIUM COOLED REACTORS; VAPOR GENERATORS