Shippingport Atomic Power Station. Technical progress report, July 26, 1982-January 25, 1983
Description
The Shippingport Atomic Power Station was operated with the Light Water Breeder Reactor (LWBR) core primarily at maximum allowable core power levels (base load) until October 1, 1982, when power operations were terminated. The LWBR core had achieved 28,730 EFPH. Several brief reductions in power for testing and maintenance occurred during this period. The end-of-life test program began October 1, 1982, and was completed 30, 1982. Preparation of the plant for defueling was completed and defueling was started on December 7, 1982. The core is being removed so that the spent fuel can be shipped to the Naval Reactors Expended Core Facility for a detailed examination to verify core performance including an evaluation of breeding characteristics
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01 as DE83011214.
Files
Additional details
Publishing Information
- Imprint Pagination
- 38 p.
- Report number
- WAPD-MRP--159
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 14780024
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- LWBR TYPE REACTORS; REACTOR CORES; REACTOR KINETICS; REACTOR MAINTENANCE; REACTOR OPERATION; SHIPPINGPORT REACTOR; WATER CHEMISTRY
- Descriptors DEC
- BREEDER REACTORS; ENRICHED URANIUM REACTORS; KINETICS; MAINTENANCE; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WATER TREATMENT