Miscellaneous Open

Information letter 10. Information about operation of Jadrova vyradovacia spolocnost, a.s. and plants SE-NPP Bohunice during October 2006

Description

In this leaflet results of exploitation of four units of the Bohunice V1 and V2 NPPs are presented. The electricity and heat production in October 2006 are reviewed. Within a October 2006 the electricity was produced in NPP V1: 313.778 GWh (block 1), 209.838 GWh (block 2), totally 523.616 GWh, and 5125.651 GWh within a January - October 2006. Within a October 2006 the NPP V2: blocks 3 and 4 has worked on nominal power. Processing and storage of radioactive wastes in Jadrova vyradovacia spolocnost (JAVYS) is presented. Seventeen pieces of fibre-concrete containers were processed into fibre-concrete containers in Bohunice processing centre of radioactive wastes (BSC RAO) in October 2006. Thirty-eight fibre-concrete containers were stored into Republic storage of radioactive wastes (RU RAO). Total number in RU RAO reached 1234 pieces of fibre-concrete containers, which represent 17.14 percent of storage capacity (7200 containers)

Availability note (English)

Available from INIS in electronic form

Files

38059351.pdf

Files (332.5 kB)

Name Size Download all
md5:de9dd22679f8bdae8e1bfe3d5bc54986
332.5 kB Preview Download

Additional details

Additional titles

Original title (Slovak)
Informacny list 10. Informacie o cinnosti Jadrovej vyradovacej spolocnosti, a.s. a zavodu SE-EBO za 10/2006

Publishing Information

Publisher
Jadrova vyradovacia spolocnost, a.s.
Imprint Place
Jaslovske Bohunice (Slovakia)
Imprint Pagination
2 p.
Report number
INIS-SK--2007-004

Optional Information

Notes
2 tab.; English version can be ordered from Omega Info, Vysehradska 33, 851 06 Bratislava, Slovak Republic (e-mail: info@omegainfo.sk), at USD 15.- per standard typewritten page (1800 characters)