Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

  • 1. Pacific Northwest Lab., Richland, WA (United States)

Description

With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as TI95013055; NTIS; GPO.

Files

26077360.pdf

Files (3.3 MB)

Name Size Download all
md5:ed7de31bf09ede5d3f1f884c193e8e67
3.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
178 p.
Report number
NUREG/CR--6270

Optional Information

Contract/Grant/Project number
Contract AC06-76RL01830
Funding organization
Nuclear Regulatory Commission, Washington, DC (United States).
Secondary number(s)
PNL--10086.