Published 2001 | Version v1
Miscellaneous Open

Change of secondary water regime of Paks NPP. Change of secondary water regime at Unit 2

  • 1. Paks Nuclear Power Plant, Paks (Hungary)

Description

The installation of high pH water regime during the 17th cycle of Unit 2 aimed to decrease the amount of transportation inlet of erosion-corrosion products (magnitude) in feedwater to SGs. The resolution of OAH-NBI permitting the installation ordained to make an evaluation of the process. The main conclusions and results are discussed. The high pH water regime proved to be adequate in the case of Unit 2 as well, similarly to Units 3, 4 and 1. (R.P.)

Files

33018424.pdf

Files (188.4 kB)

Name Size Download all
md5:607741b1a115b75d82452f9a273d4bdd
188.4 kB Preview Download
Part of:
5. International seminar on primary and secondary side water chemistry of nuclear power plants

Additional details

Publishing Information

Publisher
Paks Nuclear Power Plant Co. Ltd.
Imprint Title
5. International seminar on primary and secondary side water chemistry of nuclear power plants
Imprint Pagination
235 p.
Journal Page Range
p. 77-81
Report number
INIS-HU--005

Conference

Title
5. International seminar on primary and secondary side water chemistry of nuclear power plants
Dates
17-20 Sep 2001
Place
Eger (Hungary)

Optional Information