Published March 2002 | Version v1
Report Open

Development of procedural requirements for life extension of nuclear power plants

  • 1. Korea Association for Nuclear Technology, Taejon (Korea, Republic of)
  • 2. Baekseok College, Cheonan (Korea, Republic of)
  • 3. Sunmoon Univ., Asan (Korea, Republic of)
  • 4. The Catholic University of Korea, Seoul (Korea, Republic of)
  • 5. Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

Description

Technical issues relevant to life extension of NPP were investigated. The GALL report, domestic PSR and periodic inspection rules were reviewed. Technical issues appearing in the safety evaluation reports related to license renewal of Calvert Ciffs 1 and 2 and Qconee 1,2 and 3 NPPs were reviewed. Preliminary study on PSA usage in NPP life extension assessment was performed and further works were suggested. The environment of rules and regulations was analyzed from the viewpoint of plant life extension. Two alternatives are suggested to revise the current domestic nuclear acts

Availability note (English)

Available from INIS in electronic form; Also available from KINS

Files

37110613.pdf

Files (3.3 MB)

Name Size Download all
md5:e561656487c98c5230c7600534008d2e
3.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
134 p.
Report number
KINS/HR--432

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
37110613
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Descriptors DEI
INSPECTION; LICENSES; LIFETIME EXTENSION; NUCLEAR POWER PLANTS; PROBABILITY; RADIATION PROTECTION; REGULATIONS; SAFETY ANALYSIS
Descriptors DEC
LAWS; LIFETIME; NUCLEAR FACILITIES; POWER PLANTS; SERVICE LIFE; THERMAL POWER PLANTS

Optional Information

Notes
41 refs, 51 tabs