Published March 2002
| Version v1
Report
Open
Development of procedural requirements for life extension of nuclear power plants
Creators
- 1. Korea Association for Nuclear Technology, Taejon (Korea, Republic of)
- 2. Baekseok College, Cheonan (Korea, Republic of)
- 3. Sunmoon Univ., Asan (Korea, Republic of)
- 4. The Catholic University of Korea, Seoul (Korea, Republic of)
- 5. Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)
Description
Technical issues relevant to life extension of NPP were investigated. The GALL report, domestic PSR and periodic inspection rules were reviewed. Technical issues appearing in the safety evaluation reports related to license renewal of Calvert Ciffs 1 and 2 and Qconee 1,2 and 3 NPPs were reviewed. Preliminary study on PSA usage in NPP life extension assessment was performed and further works were suggested. The environment of rules and regulations was analyzed from the viewpoint of plant life extension. Two alternatives are suggested to revise the current domestic nuclear acts
Availability note (English)
Available from INIS in electronic form; Also available from KINSFiles
37110613.pdf
Files
(3.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:e561656487c98c5230c7600534008d2e
|
3.3 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 134 p.
- Report number
- KINS/HR--432
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 37110613
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- INSPECTION; LICENSES; LIFETIME EXTENSION; NUCLEAR POWER PLANTS; PROBABILITY; RADIATION PROTECTION; REGULATIONS; SAFETY ANALYSIS
- Descriptors DEC
- LAWS; LIFETIME; NUCLEAR FACILITIES; POWER PLANTS; SERVICE LIFE; THERMAL POWER PLANTS
Optional Information
- Notes
- 41 refs, 51 tabs