The use of computer fire model has been dramatically increased due to a rapid development of computer hardware and numerical scheme as well. NFPA 805 requires fire models to be verified and validated against the geometric complexity of analysis regime and range of features in the models. To meet the requirement, US NRC along with EPRI and NIST had conducted an extensive verification and validation (V and V) study of fire models, which support the use of NFPA 805. NUREG-1824, which is based on ASTM E1355, is the product of the above V and V study. Verification and validation of a calculation method is intended to ensure the correctness, suitability and applicability of the method. The fire load of a day tank room of emergency diesel generator building is relatively very high compared to that of the other compartments in a nuclear power plant (NPP). This study is intended to validate the FDS5 (Fire Dynamics Simulator Ver.5) simulation results of a postulated fire at a typical day tank room of emergency diesel generator building in NPPs

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2010 autumn meeting of the KNS
Dates
21-22 Oct 2010
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
42085173
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COMPUTERIZED SIMULATION; FIRES; NUCLEAR POWER PLANTS; TANKS; VALIDATION; VERIFICATION
Descriptors DEC
CONTAINERS; NUCLEAR FACILITIES; POWER PLANTS; SIMULATION; TESTING; THERMAL POWER PLANTS

Optional Information

Notes
4 refs, 5 figs, 3 tabs