Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

Description

The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96003265; NTIS; US Govt. Printing Office Dep.

Files

27037099.pdf

Files (363.2 kB)

Name Size Download all
md5:ae5f3c26c93c54ab949ee384ceaca727
363.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
Y/EN--5331

Optional Information

Contract/Grant/Project number
Contract AC05-84OR21400
Funding organization
USDOE, Washington, DC (United States).