Published July 1994 | Version v1
Journal article

Main control panel design and simulator in advanced boiling water reactor [ABWR]

  • 1. Tokyo Electric Power Co., Inc. (Japan)

Description

The ABWR type main control panel has been developed to enhance the reliability of plant monitoring and operation. This panel consists of large display panels and a compact main console, which enables operators to work from their seated position. Primary plant and system status information is presented on large display panels so that the information can be shared by the entire operating crew. This panel is applied to Kashiwazaki-Kariwa Nuclear Power Station Unit 6 which is scheduled to begin commercial operation in 1996. The ABWR type main control panel is quite different from the conventional one. Consequently the full-scope ABWR simulator is under construction, which will be completed in 1994, so that the operators will be trained sufficiently. (author)

Additional details

Publishing Information

Journal Title
Karyoku Genshiryoku Hatsuden
Journal Volume
45
Journal Issue
7
Journal Page Range
p. 789-796.
ISSN
0387-1029
CODEN
KGHTA8