Specific features of the licensing procedure for the decommissioning of the research reactor Munich

  • 1. Brenk Systemplanung GmbH, Aachen (Germany)

Description

The FRM was the first research reactor in Germany, the reactor was shut-down in 2000, is now in the post-operation status. In consequence of the reactor decommissioning the facility will not be completely deconstructed, the building is supposed to be integrated into the FRM-II. Due to the regulations of monument conservation the external structure of the building cannot be modified. The authors describe the licensing application, the concept for the reactor dismantling, the deconstruction of activated metallic parts, the deconstruction of the irradiation facilities, the decontamination of the reactor hall and the ring building. Low-level radioactive water will be transferred to FRM-II. The accident issue covers scenarios that could induce fission product release into the environment: fire, leakage of radioactive material containing tanks, supply equipment failures, external impacts (earth quakes, flooding, storms, explosions).

Part of:
Annual meeting on nuclear technology 2011. Documentation

Additional details

Additional titles

Original title (German)
Besonderheiten des Genehmigungsverfahrens zur Stilllegung des Forschungsreaktors Muenchen

Publishing Information

Imprint Title
Annual meeting on nuclear technology 2011. Documentation
Imprint Pagination
870 p.
Journal Page Range
8 p.

Conference

Title
Annual meeting on nuclear technology 2011
Original Conference Title
Jahrestagung Kerntechnik 2011
Dates
17-19 May 2011
Place
Berlin (Germany)

Optional Information

Notes
Imprint:Jahrestagung Kerntechnik 2011. Dokumentation