High Flux Isotope Reactor quarterly report, July--September 1975

Description

The replacement of the permanent beryllium reflector was completed this quarter. The reactor was shut down for 87 days for this maintenance operation. Erosion of the sealing surface at the stainless steel adaptor flange on the HB-1 beam tube facility was confirmed. A soft metallic O-ring was used to effect a seal when this facility was reassembled. A comprehensive inspection of the normally inaccessible parts of the reactor pressure vessel was made. No abnormalities were found