Published 1975
| Version v1
Report
Open
High Flux Isotope Reactor quarterly report, July--September 1975
Description
The replacement of the permanent beryllium reflector was completed this quarter. The reactor was shut down for 87 days for this maintenance operation. Erosion of the sealing surface at the stainless steel adaptor flange on the HB-1 beam tube facility was confirmed. A soft metallic O-ring was used to effect a seal when this facility was reassembled. A comprehensive inspection of the normally inaccessible parts of the reactor pressure vessel was made. No abnormalities were found
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS.Files
7269191.pdf
Files
(646.7 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:30f17b589ee37a7fb3757222d63df757
|
646.7 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 19 p.
- Report number
- ORNL/TM--5320
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 7269191
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- FUEL CYCLE; HFIR REACTOR; REACTOR MAINTENANCE; REACTOR OPERATION
- Descriptors DEC
- ENRICHED URANIUM REACTORS; IRRADIATION REACTORS; ISOTOPE PRODUCTION REACTORS; MAINTENANCE; OPERATION; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; TANK TYPE REACTORS; TEST REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- Available from NTIS. $4.00.