Published 1993
| Version v1
Journal article
Grand Gulf-prioritization of regulatory requirements
Description
As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit
Additional details
Publishing Information
- Journal Title
- Transactions of the American Nuclear Society
- Journal Volume
- 69
- Journal Page Range
- p. 344-345.
- ISSN
- 0003-018X
- CODEN
- TANSAO
Conference
- Title
- American Nuclear Society (ANS) winter meeting.
- Dates
- 14-18 Nov 1993.
- Place
- San Francisco, CA (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26025980
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST; COST BENEFIT ANALYSIS; GRAND GULF-1 REACTOR; POLITICAL ASPECTS; REACTOR SAFETY; REGULATIONS; RISK ASSESSMENT
- Descriptors DEC
- BWR TYPE REACTORS; ECONOMIC ANALYSIS; ENRICHED URANIUM REACTORS; LAWS; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- CONF-931160--.