Published 2021 | Version v1
Miscellaneous

Present status of J-PARC linac LLRF system

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)
  • 2. Japan Atomic Energy Agency, J-PARC Center, Tokai, Ibaraki (Japan)
  • 3. NAT Corporation, Tokai, Ibaraki (Japan)

Description

In the J-PARC linac, more than 15 years passed since the low level radio-frequency (LLRF) system were manufactured, and it is in a phase where failures increase due to aging deterioration. In the summer shutdown of 2020, we installed seventeen new digitizersinstead of some digitial boards of cPCI from DTL3 to SDTL16 for the digital feedback and feedfoward (DFB·FF) system. We had to rebuild the LLRF system for this installation of the new digitizer. But we were able to perform the user operatoin without serious trouble. Also, it was clear that the momentum od the output beam fluctuates depending on the humidity of the klystron gallery. The RF reference distribution system was improved to be able to measure the phase drift from the summer shutdown of 2020. For some measured phase drift values, the operation of phase drift correction has been started. (author)

Availability note (English)

Available from https://www.pasj.jp/web_publish/pasj2021/proceedings/PDF/THP0/THP046.pdf
Part of:
Proceedings of the 18th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
J-PARCリニアックにおける低電力高周波制御システムの現状

Publishing Information

Imprint Title
Proceedings of the 18th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[998 p.]
Journal Page Range
p. 937-941

Conference

Title
18. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2021
Dates
9-12 Aug 2021
Place
Japan (Japan)

Optional Information

Notes
5 refs., 6 figs., 2 tabs. Imprint:This symposium was held online