Nuclear power plant operation and training

  • 1. Tokyo Electric Power Co., Inc. (Japan)

Description

In this report, the system for operation of a nuclear power plant and the qualities required for its operators were summarized. In Kashiwazaki-Kariwa Atomic Power Plant of the Tokyo Electric Power Co., Inc. operation is continuously made by 6 groups containing each 10 workers on three shifts. A group including the person in charge participates in the operation through cooperation of the control center and the respective spots. The group leaders are chosen from those approved as a person responsible to its operation. The conditions for the person responsible were as follows: to receive simulator training for senior operator, to have more than 7 years experience of operating a nuclear power plant, to pass a practical examination on the ordinary operation and the emergency one, to receive a training course to master the knowledge and techniques for operating an atomic reactor and to success the oral examination on practical knowledge required to perform the duty. Further, the simulators for ABWR training produced by Toshiba Corp. and Hitachi Ltd. were introduced as an example. And the practical training procedures to manipulate the simulator were presented. (M.N.)

Additional details

Publishing Information

Journal Title
Denki Gakkai-Shi
Journal Volume
117
Journal Issue
8
Journal Page Range
p. 528-531.
ISSN
1340-5551
CODEN
DGAKE9