Published September 1989 | Version v1
Report Open

Management and ultimate storage of wastes from nuclear power production

Description

The aim of the laboratory is to facilitate research and development in a realistic and undisturbed rock environment down to the depths planned for the future ultimate radioactive waste storage. The main R and D goals are: - Testing of quality and usefulness of different methods to characterize the bed-rock with respect to conditions of importance for an ultimate storage. - Further development and demonstration of methods to adapt projecting and building to the local properties of the rock. - Production of data of importance for the storage safety and for the confidence in the safety analysis quality. The building of the laboratory is planned to start in summer 1990 and will be finished at the beginning of 1994. (O.S.)

Availability note (English)

MF available from INIS under the Report Number.

Files

21015370.pdf

Files (1.5 MB)

Name Size Download all
md5:adc069623d2d6bff20aa20a478b62250
1.5 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Underground hardrock laboratory
Original title (Swedish)
Kaernkraftavfallets behandling och slutfoervaring
Original subtitle (Swedish)
Underjordiskt berglaboratorium.

Publishing Information

Imprint Pagination
57 p.
Report number
NEI-SE--47