Published September 1975 | Version v1
Report Restricted

Decontamination and disposition of Hallam and Piqua reactors

  • 1. Atomics International, Canoga Park, CA

Description

The Hallam Nuclear Power Facility, a sodium cooled, graphite moderated, 256 Mw(t) power reactor, went critical in 1962, was shut down as a result of moderator problems in 1964, and was decommissioned in 1969. The Piqua Nuclear Power Facility, an organic cooled, 45 Mw(t) power reactor went critical in 1963, was shut down in 1966 because of coolant problems, and was decommissioned in 1969. Fuel, coolant, and support systems of both reactors were removed from the site. The reactor vessels are entombed at their sites. Remaining systems at Hallam were sealed in the underground vaults and were then covered with six feet of earth. The Piqua vessel is sealed in the concrete reactor containment building. The state of Nebraska is responsible for monitoring 3 x 105 curies in 1969. The Piqua site was purchased by the U. S. Government and then leased to the City of Piqua. The remaining radioactivity at Piqua was 2.6 x 105 curies

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Title
Proceedings of the first conference on decontamination and decommissioning (D and D) of ERDA facilities
Imprint Pagination
p. 139-151.
Report number
CONF-750827--

Conference

Title
Conference on decontamination and decommissioning of ERDA facilities.
Dates
19 Aug 1975.
Place
Idaho Falls, Idaho, USA.