Published January 13, 2003 | Version v1
Report

Methodological Validation of MERMOS by 160 analyses

  • 1. EDF, R andD Division, MRI - Batiment J2, 1 avenue du General de Gaulle, 92141 Clamart CEDEX (France)
  • 2. EDF, Basic Design Department, 1 avenue du General de Gaulle, 92141 Clamart CEDEX (France)

Description

Electricite de France has developed MERMOS, a new PHRA method for the probabilistic safety assessment of the N4 1450 MW units, the most recent type of French reactors with a computerised control room. The distinctive feature of Ed's PSAs is that they are carried out on a set of identical units. Two facilities have N4-type units with a computerised control room, Chooz and Civaux, each with two units. A set of validation actions marked the development of the MERMOS method, and its subsequent application in the frame of the N4 PSA in which 160 MERMOS analyses were performed. These validation actions revolve around two axes which are, on the one hand, the theoretic validation of the method, i.e. its scientific validation, and, on the other hand, its industrial validation. No objective and universal criterion is available to this day to assess a PHRA method, and validation must still be performed case by case based on criteria which remain to be defined with respect to the objective of the implementation of the method. This PHRA feature, already highlighted in the conclusions of the benchmark performed at ISPRA in 1989 [12], is still very true today: ' Where the HF-RBE (Human Factor Reliability Benchmark Exercise) failed is in establishing consensus procedures and methods. From the results and discussions it appears that human reliability analysis is still rather an art than a science and it is too early to try to specify preferred ways of performing the analysis...'. (authors)

Part of:
Proceedings of the international workshop on building the new HRA: errors of commission - from research to application

Additional details

Publishing Information

Imprint Title
Proceedings of the international workshop on building the new HRA: errors of commission - from research to application
Imprint Pagination
270 p.
Journal Page Range
p. 97-104
Report number
NEA-CSNI-R--2002-3

Conference

Title
errors of commission - from research to application
Acronym
International workshop on building the new HRA
Dates
7-9 May 2001
Place
Rockville, Maryland (United States)

INIS

Country of Publication
Nuclear Energy Agency of the OECD (NEA)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
39075443
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BENCHMARKS; CONTROL ROOMS; ELECTRICITE DE FRANCE; HUMAN FACTORS; PROBABILISTIC ESTIMATION; RELIABILITY; RISK ASSESSMENT; VALIDATION
Descriptors DEC
CALCULATION METHODS; FRENCH ORGANIZATIONS; NATIONAL ORGANIZATIONS; TESTING

Optional Information

Notes
11 refs.