New energy ramping control system in the Pohang Light Source Storage Ring

  • 1. Pohang Accelerator Laboratory, POSTECH, Pohang, Kyungbuk (Korea, Republic of)

Description

A new energy ramping control system is developed to increase electron beam energy from 2.0 GeV to 2.5 GeV in the Pohang Light Source storage ring. The control system shows faster energy ramping and more stable beam characteristics than the previous energy ramping control system that consists of an operator interface workstation, subsystem control computer and machine interface units. The previous system controls current settings of the magnet power supplies in multiple steps with different energy increment rate during the energy ramping. In order to improve synchronization of the magnet power supply systems and beam stabilities during the energy ramping, we developed the energy ramping controller hardware that is controlled using a network of optical fibers. Thus, the new ramping system is able to control more synchronously the magnet power supplies with a constant energy increment rate during the energy ramping. With this reliable synchronization, it is also possible to perform the energy de-ramping step from 2.5 GeV to 2.0 GeV on operation. We present the new energy ramping control system and its improved performance on operation. (author)

Additional details

Publishing Information

Journal Title
Japanese Journal of Applied Physics. Part 1, Regular Papers, Short Notes and Review Papers
Journal Volume
42
Journal Issue
4A
Journal Page Range
p. 1807-1811
ISSN
0021-4922

Optional Information

Notes
6 refs., 8 figs., 1 tab.