Published May 9, 2005 | Version v1
Report

Current Status of the Next Linear Collider X-Band Klystron Development Program

Description

Klystrons capable of driving accelerator sections in the Next Linear Collider (NLC) have been developed at SLAC during the last decade. In addition to fourteen 50 MW solenoid-focused devices and a 50 MW Periodic Permanent Magnet focused (PPM) klystron, a 500 kV 75 MW PPM klystron was tested in 1999 to 80 MW with 3 (micro)s pulses, but very low duty. Subsequent 75 MW prototypes aimed for low-cost manufacture by employing reusable focusing structures external to the vacuum, similar to a solenoid electromagnet. During the PPM klystron development, several partners (CPI, EEV and Toshiba) have participated by constructing partial or complete PPM klystrons. After early failures during testing of the first two devices, SLAC has recently tested this design (XP3-3) to the full NLC specifications of 75 MW, 1.6 (micro)s pulse length, and 120 Hz. This 14.4 kW average power operation came with an efficiency of 50%. The XP3-3 average and peak output power, together with the focusing method, arguably makes it the most advanced high power klystron ever built anywhere in the world. Design considerations and test results for these latest prototypes will be presented

Availability note (English)

Available from http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-11162.pdf; http://www.slac.stanford.edu/cgi-wrap/pubpage?slac-pub-11162.html; PURL: https://www.osti.gov/servlets/purl/890846-Suvm0S/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
SLAC-PUB--11162

Conference

Title
9. European Particle Accelerator Conference (EPAC 2004)
Dates
5-9 Jul 2004
Place
Lucerne (Switzerland)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
38003085
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; DESIGN; EFFICIENCY; FOCUSING; KLYSTRONS; LINEAR COLLIDERS; PERMANENT MAGNETS; SOLENOIDS; SPECIFICATIONS; STANFORD LINEAR ACCELERATOR CENTER; TESTING
Descriptors DEC
ACCELERATORS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; ELECTRON TUBES; ELECTRONIC EQUIPMENT; EQUIPMENT; LINEAR ACCELERATORS; MAGNETS; MICROWAVE EQUIPMENT; MICROWAVE TUBES; NATIONAL ORGANIZATIONS; US DOE; US ERDA; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-76SF00515
Funding organization
US Department of Energy (United States)