Published 2007 | Version v1
Computer medium

Development of spent fuel transport system and first shipment in China

Creators

  • 1. CNNC Everclean Co. Ltd., Beijing (China)

Description

With the generation of spent fuel from nuclear power plants (NPPs) continuously increased, a national policy of a CLOSED NUCLEAR FUEL CYCLE has been determined. To match this policy and meet the requirements of NPP safe operation, an integrated spent fuel transport system has been established with a long distance of road transport by 2003, Two NAC-STC Dual-Purpose Casks were used. To date, 338 PWR assemblies have been shipped from Daya Bay Nuclear Power Plant located in Guangdong Province to Lanzhou Nuclear Fuel Complex (LNFC) located in Ganshu Province, first shipment of spent fuel from Qinshan NPP is expected in 2009 with other casks under procurement. A brief introduction about the system and cask operation will be given in this paper. (author)

Availability note (English)

Available from Japan Society of Mechanical Engineers, 35 Shinanomachi, Shinjuku-ku, Tokyo 160-0016, Japan
Part of:
Proceedings of the ICONE-15 (Revised). The 15th international conference on nuclear engineering

Additional details

Publishing Information

Publisher
Japan Society of Mechanical Engineers
Imprint Place
Tokyo (Japan)
Imprint Title
Proceedings of the ICONE-15 (Revised). The 15th international conference on nuclear engineering
Imprint Pagination
[3174 p.]
Journal Page Range
[5 p.]

Conference

Title
15. international conference on nuclear engineering
Acronym
ICONE-15
Dates
22-26 Apr 2007
Place
Nagoya, Aichi (Japan)

Optional Information

Notes
This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name Final Paper, PaperID ICONE15-10867.pdf; 5 refs., 3 figs.