Published 1991 | Version v1
Report Restricted

Long-term behaviour of TRU-waste-bearing ceramics Task 3 Characterization of radioactive waste forms a series of final reports (1985-89) No 16

  • 1. Kernforschungszentrum Karlsruhe (Germany)

Description

The aluminium-silicate ceramic matrix KAB 78, developed for the Immobilization of TRU wastes, has been doped with 20 wt% of Pu(238)O2, in order to irradiate the matrix by the same α-dose over a period of three years, as accumulated within a storage time of about 100 000 years, when loaded with the real TRU waste. The Pu(238)-doped ceramic KAB 78 was investigated, by means of ceramographic methods, while the accumulated α-dose increased up to 8.33 E 9 Gy (9.4 E 18 α-decays/g). Special attention was directed to the development of the microstructure, the crystalline state and the lattice constants of the matrix phases, as well as to stored energy, as a function of the accumulated α-dose. The lattice constants of the matrix phases corundum and mullite were found to be only slightly enlarged. Any sign of metamictization beginning has not been detected. Changes in the micro-structure have not occurred and the amount of stored energy has been determined to be less than 11 J/g. In order to study the corrosion behaviour of the Pu(238)-doped ceramic and ceramics loaded with real dissolver residues, leach tests were performed over a period of 214 days, using either Q-brine or Dl-water of up to 2000C. Leach rates, based on the total α-activity were found to be slightly higher, when leaching the Pu(238)-doped ceramics. Reaction zones of 150 up to 600 μm thickness were formed, with a significant decrease of Si, whereas the concentrations of Al and Pu remained unaffected

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
53 p.
Report number
EUR--13602

Optional Information

Contract/Grant/Project number
Contract No Fl1W0098/183