Facility Description 2012. Summary report of the encapsulation plant and disposal facility designs

Description

The purpose of the facility description is to be a specific summary report of the scope of Posiva's nuclear facilities (encapsulation plant and disposal facility) in Olkiluoto. This facility description is based on the 2012 designs and completing Posiva working reports. The facility description depicts the nuclear facilities and their operation as the disposal of spent nuclear fuel starts in Olkiluoto in about 2020. According to the decisions-in-principle of the government, the spent nuclear fuel from Loviisa and Olkiluoto nuclear power plants in operation and in future cumulative spent nuclear fuel from Loviisa 1 and 2, Olkiluoto 1, 2, 3 and 4 nuclear power plants, is permitted to be disposed of in Olkiluoto bedrock. The design of the disposal facility is based on the KBS-3V concept (vertical disposal). Long-term safety concept is based on the multi-barrier principle i.e. several release barriers, which ensure one another so that insufficiency in the performance of one barrier doesn't jeopardize long-term safety of the disposal. The release barriers are the following: canister, bentonite buffer and deposition tunnel backfill, and the host rock around the repository. The canisters are installed into the deposition holes, which are bored to the floor of the deposition tunnels. The canisters are enveloped with compacted bentonite blocks, which swell after absorbing water. The surrounding bedrock and the central and access tunnel backfill provide additional retardation, retention, and dilution. The nuclear facilities consist of an encapsulation plant and of underground final disposal facility including other aboveground buildings and surface structures serving the facility. The access tunnel and ventilation shafts to the underground disposal facility and some auxiliary rooms are constructed as a part of ONKALO underground rock characterization facility during years 2004-2014. The construction works needed for the repository start after obtaining the construction license. Operating phase begins in the beginning of 2020s after obtaining an operating license. More deposition and central tunnels are excavated as the disposal proceeds. The spent nuclear fuel from interim storages is encapsulated into canisters in an encapsulation plant and then transferred into the underground disposal facility with a canister lift. According to the current design, the repository layout is based on one-storey layout alternative at the level of -400...-450m. The underground disposal facility is accessed by the access tunnel and a personnel shaft, which is located in a hoist building. Other alternatives for the design and operation of the nuclear facilities are described at the end of the report. (orig.)

Availability note (English)

Also available in fulltext at www.posiva.fi or as a soft back edition from Posiva Oy, Olkiluoto, 27160 Eurajoki, Finland, tel. +358-2-837231

Files

45087767.pdf

Files (10.3 MB)

Name Size Download all
md5:c077d67a99452682d80cf76efd694bc3
10.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
148 p.
Report number
POSIVA-WR--12-66

Optional Information

Notes
61 refs.