Published November 20, 1980 | Version v1
Patent

Feedwater control system in BWR type reactor

Description

Purpose: To improve the water level control performance in BWR type reactor by regulating the water level set to the reactor depending on the rate of change in the recycling amount of coolant to thereby control the fluctuations in the water level resulted in the reactor within an aimed range even upon significant fluctuations in the recycling flow rate. Constitution: The recycling flow rate of coolant in the reactor is detected and the rate of its change with time is computed to form a rate of change signal. The rate of change signal is inputted to a reactor level setter to amend the actual reactor water level demand signal and regulate the water level set to the reactor water depending on the rate of change in the recycling flow rate. Such a regulation method for the set water level enables to control the water level fluctuation resulted in the reactor within the aimed range even upon the significant fluctuation in the recycling flow rate and improve the water level control performance of the reactor, whereby the operationability for the reactor is improved to enhance the operation rate. (Moriyama, K.)

Availability note (English)

Available from JAPATIC. Also available from INPADOC.

Additional details

Publishing Information

Imprint Pagination
5 p.
IPC:
Int. Cl. G21D3/08; G05D9/00.
IPC
Int. Cl. G21D3/08; G05D9/00.
Patent number
JP patent document 55-149099/A/

INIS