Published December 2009 | Version v1
Report Open

In-Pile Section(IPS) Inner Assembly Manufacturing Report

Description

The objective of this report is to present the manufacturing, assembling and testing process of IPS Inner Assembly used in Fuel Test Loop(FTL) pre-operation test. The majority of the manufactured components are test fuels, inner assembly structures and subsidiary tools that is needed during the assembly process. In addition, Mock-up test for the welding and brazing is included at this stage. Lower structure, such as test fuels, fuel carrier legs are assembled and following structures, such as fuel carrier stem in the middle structure, top flange in the top structure are assembled together each other. To Verify the Reactor Coolant Pressure Boundary(RCPB) function in IPS Inner Assembly helium leak test and hydraulic test is performed with its acceptance criteria. According to the ASME III code Authorized Nuclear Inspector(ANI) is required during the hydraulic test. As-built measurement and insulation resistance test are performed to the structures and instrumentations after the test process. All requirements are satisfied and the IPS Inner Assembly was loaded in HANARO IR-1 hole in September 25, 2009

Availability note (English)

Also available from KAERI

Files

42004678.pdf

Files (8.0 MB)

Name Size Download all
md5:16d93ffd0e1cef32962f87332786216a
8.0 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
108 p.
Report number
KAERI/TR--3973/2009

Optional Information

Notes
5 refs, 35 figs, 4 tabs