Published January 2018 | Version v1
Journal article

Can Gammaprox, a little selenium 75 and Freund suspension keep an activity off the critical path when replacing a heat exchanger in a machine room at a nuclear site?

  • 1. Institut de Soudure, 90 rue des Vanesses 93420 Villepinte (France)
  • 2. EDF, DPTN-DIPTE-DR - ECC - Equipe commune de Cattenom, Bat BPS bureau 1-08, BP 41, 57570 Cattenom (France)

Description

The aim of this article is to demonstrate, by means of a theoretical study followed by actual measurements, that it is possible to produce radiographs with partial beaconing of the machine room of an EDF nuclear power plant, by implementing optimisation tools in order to reduce to a reasonable minimum the exposure to ionising radiation of public personnel working at the limit of this partial beaconing

Abstract (French)

Cet article a pour but de demontrer par une etude theorique suivie de mesures reelles qu'il est possible de realiser des radiographies avec un balisage partiel de la salle des machines d'une centrale nucleaire EDF moyennant la mise en oeuvre d'outils d'optimisation afin de reduire au minimum raisonable l'exposition aux rayonnements ionisants du personnel public travaillant a la limite de ce balisage partiel

Additional details

Additional titles

Original title (French)
Du Gammaprox, un peu de selenium 75 et de la suspension Freund peuvent-ils ecarter du chemin critique une activite lors du remplacement d'echangeur dans une salle des machines d'un site nucleaire?

Publishing Information

Journal Title
Soudage et Techniques Connexes
Journal Volume
72
Journal Issue
no.1-2
Journal Page Range
p. 31-41
ISSN
0246-0963