Published 2002 | Version v1
Miscellaneous Open

Construction of new nuclear power plant in Bulgaria - incentives and problems

  • 1. Atomenergoproekt Ltd., Sofia (Bulgaria)
  • 2. EcoEnergy Consult Ltd., Sofia (Bulgaria)

Description

Advantages and disadvantages of constriction of new nuclear power plant in Bulgaria are discussed. Several options for further development are considered: Completion of the Belene NPP; Evolutionary design installations PWR technology, 600 MW (AP-600 Westinghouse design; B-407 Russian design); Standard design of Framatome, 900 MW; Standard design - heavy water technology CANDU-6 (700 MW) and other.The results of the preliminary economic analyses show that the first two options are approximately equal, but the all options are acceptable from investment point of view, considering an average macro economic environment. The need of assessment of all aspects (technical, economical, financial, social, environmental, national infrastructure) of nuclear sector development is outlined

Availability note (English)

Available from INIS in electronic form

Files

33070674.pdf

Files (202.9 kB)

Name Size Download all
md5:c9fae35bf33995ee3725483f1e77d1f2
202.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
INIS-BG--0424

Conference

Title
Options, Challenges and Future'
Acronym
International Nuclear Forum 'Nuclear Power in Eastern Europe
Dates
28-30 Jun 2002
Place
Varna (Bulgaria)

INIS

Country of Publication
Bulgaria
Country of Input or Organization
Bulgaria
INIS RN
33070674
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BULGARIA; CONSTRUCTION; DECISION MAKING; ECONOMIC ANALYSIS; ENERGY POLICY; NUCLEAR POWER PLANTS; PLANNING
Descriptors DEC
DEVELOPING COUNTRIES; EASTERN EUROPE; ECONOMICS; EUROPE; GOVERNMENT POLICIES; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Notes
5 figs.