Published February 1992
| Version v1
Report
New ideas for the uncertainty analysis methodology
Description
The methodology of probabilistic safety analysis of nuclear power plants is discussed. A simple model was set up for testing the Monte Carlo method, which is most popular in deriving the fault tree. A new method is proposed for determining the error factor of probabilistic characteristics of secondary events in the fault tree. A rich regression model of the analyzed function of three variables, with eighty regressors in eight orthogonal blocks, was developed as a technical supplement to the procedure improvement suggested. (M.D.). 4 tabs., 21 figs
Availability note (English)
Available from Nuclear Research Institute Rez near Prague.Additional details
Additional titles
- Original title (Czech)
- Nove podnety pro metodiku analyzy nejistot
Publishing Information
- Imprint Pagination
- 130 p.
- Report number
- UJV--9624-T
INIS
- Country of Publication
- Serbia and Montenegro
- Country of Input or Organization
- Serbia and Montenegro
- INIS RN
- 24030819
- Subject category
- S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- ACCURACY; FAULT TREE ANALYSIS; MATHEMATICAL MODELS; MONTE CARLO METHOD; N CODES; NUCLEAR POWER PLANTS; PROBABILISTIC ESTIMATION; R CODES; REACTOR SAFETY; REGRESSION ANALYSIS; RELIABILITY; RISK ASSESSMENT
- Descriptors DEC
- CALCULATION METHODS; COMPUTER CODES; MATHEMATICS; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; STATISTICS; SYSTEM FAILURE ANALYSIS; SYSTEMS ANALYSIS; THERMAL POWER PLANTS