Published March 2012 | Version v1
Report Restricted

Fabrication and replacement work of beryllium frame and gamma-ray shield

  • 1. Japan Atomic Energy Agency, Oarai Research and Development Center, Oarai, Ibaraki (Japan)

Description

This replacement work was carried out under refurbishment plan of JMTR for beryllium distortion draw to acceptable limit. And gamma-ray shield refurbishment was carried out the view point of prevention maintenance in consideration of operation plan. Fabrication of beryllium frame and gamma-ray shield was spent for two years it was finished in February, 2010. It took five months to replacement work from January 2010. In this report is presented fabrication and replacement work of beryllium frame and gamma-ray shield. (author)

Availability note (English)

Available from JAEA; DOI: https://doi.org/10.11484/jaea-review-2012-013

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

System files (158.7 kB)

Name Size Download all

Additional details

Publishing Information

Imprint Pagination
102 p.
Report number
JAEA-Review--2012-013

Optional Information

Notes
7 refs., 15 figs., 16 tabs., 63 photos