Published February 1980
| Version v1
Report
Restricted
Tandem mirror hybrid reactor study (LLL Purchase Order 6887809 dated August 31, 1979)
Description
The results, bases, qualifications, and exclusions of the preconceptual cost estimate are presented below. This estimate is an order-of-magnitude assessment of the direct level POP Costs. The direct level cost consists of: (1) total cost of all materials forming the permanent part of the completed plant, and (2) total cost of all labor engaged in installing and erecting all materials forming the permanent part of the completed plant. A cost summary and a supporting breakdown of this estimate are shown
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 20 p.
- Report number
- UCRL--15245(Vol.1)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 11556625
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Descriptors DEI
- COST; ECONOMICS; HYBRID REACTORS; MAGNETIC MIRRORS; SPECIFICATIONS; THERMONUCLEAR POWER PLANTS
- Descriptors DEC
- NUCLEAR FACILITIES; NUCLEAR POWER PLANTS; OPEN PLASMA DEVICES; POWER PLANTS; THERMAL POWER PLANTS; THERMONUCLEAR DEVICES