Published 1983 | Version v1
Report Open

EBR-II high-ramp transients under computer control

Description

During reactor run 122, EBR-II was subjected to 13 computer-controlled overpower transients at ramps of 4 MWt/s to qualify the facility and fuel for transient testing of LMFBR oxide fuels as part of the EBR-II operational-reliability-testing (ORT) program. A computer-controlled automatic control-rod drive system (ACRDS), designed by EBR-II personnel, permitted automatic control on demand power during the transients

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01; 1 as DE83014314.

Files

14795548.pdf

Files (199.5 kB)

Name Size Download all
md5:bd0bab6480e3b217c303290e5cfe13e1
199.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
16 p.
Report number
CONF-830609--25

Conference

Title
ANS annual meeting.
Dates
12-17 Jun 1983.
Place
Detroit, MI (USA).