Abnormal transient analysis by using PWR plant simulator, (2)

  • 1. Japan Nuclear Ship Research and Development Agency, Tokyo

Description

This report describes results of abnormal transient analysis by using a PWR plant simulator. The simulator is based on an existing 822MWe power plant with 3 loops, and designed to cover wide range of plant operation from cold shutdown to full power at EOL. In the simulator, malfunctions are provided for abnormal conditions of equipment failures, and in this report, 17 malfunctions for secondary system and 4 malfunctions for nuclear instrumentation systems were simulated. The abnormal conditions are turbine and generator trip, failure of condenser, feedwater system and valve and detector failures of pressure and water level. Fathermore, failure of nuclear instrumentations are involved such as source range channel, intermediate range channel and audio counter. Transient behaviors caused by added malfunctions were reasonable and detail information of dynamic characteristics for turbine-condenser system were obtained. (author)

Availability note (English)

MF available from INIS under the Report Number.

Files

15053436.pdf

Files (5.0 MB)

Name Size Download all
md5:f32af1cc00c767e17eb335623a2f1394
5.0 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Secondary system analysis

Publishing Information

Imprint Pagination
103 p.
Report number
JAERI-M--83-081