Published 2007 | Version v1
Miscellaneous Open

AREVA first half 2007 sales revenue

Description

The AREVA group's backlog as of June 30, 2007 was euros 33.5 billion, up 31% compared with that of December 31, 2006. On average, the Group's backlog increased by more than 20% annually over the last three years. It is now at the highest level since AREVA was established in 2001. All divisions contributed to this performance: - The Front End division signed in particular a major enrichment contract with KHNP (South Korea), a fuel supply contract with EDF covering the 2008-2012 period and other significant contracts with Japanese and Swedish utilities. - The Reactors and Services division added the Flamanville 3 EPR, ordered by EDF, to the backlog. Flamanville 3 is AREVA's 100. reactor order. - The Back End division also concluded a major contract with Sogin to treat used fuel stored at Italian nuclear sites. - The Transmission and Distribution division continued to record strong growth. New orders were up 24% compared with the first half of 2006 (+25.1% like-for-like). Important contracts were signed in the Middle East, Russia and with large industrial users of electricity. First half 2007 sales revenue was up 6.7% (+6.4% like-for-like) to euros 5373 million, compared with euros 5036 million for the first half of 2006. Major developments in the first half of 2007 include: - Sales revenue was down 2.8% to euros 1342 million in the Front End division (-3.6% like-for- like) due to uneven distribution of deliveries in the Fuel business unfavorable during the period. This timing issue has no impact on projected annual growth. The division continues to benefit from a gradual price increase for long-term uranium supply contracts. - Sales revenue was up 4.8% to euros 1154 million in the Reactors and Services division (+3% like-for-like). The Services business unit, especially, was a major contributor to growth on all its markets after a 2006 fiscal year marked by a weak demand. The start of construction of a second EPR reactor for EDF, Flamanville 3, also contributed to the division's revenue increase. - Sales revenue for the Back End division was steady in comparison to the first half of 2006, at euros 856 million. - The Transmission and Distribution division recorded growth of 18.8% (+19.5% like-for- like). For the first time, the T and D division recognized more than euros 2 billion in sales revenue for a six-month period, at euros 2 021 million. The Systems and Products business units contributed significantly to growth in all regions. Outlook: The group confirms its strong sales revenue growth objective for 2007

Availability note (English)

Available from INIS in electronic form

Files

38105259.pdf

Files (123.8 kB)

Name Size Download all
md5:789b00f20580a58e30f83a9bf1f1f2f5
123.8 kB Preview Download

Additional details

Additional titles

Original title (English)
AREVA chiffre d'affaires du 1. semestre 2007

Publishing Information

Imprint Pagination
4 p.
Report number
INIS-FR--6645

INIS

Country of Publication
France
Country of Input or Organization
France
INIS RN
38105259
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S24: POWER TRANSMISSION AND DISTRIBUTION;
Resource subtype / Literary indicator
Numerical Data
Descriptors DEI
BUSINESS; CONTRACTS; FINANCIAL DATA; FUEL CYCLE; NUCLEAR ENGINEERING; NUCLEAR INDUSTRY; POWER TRANSMISSION; PROFITS; SALES
Descriptors DEC
DATA; ENGINEERING; INDUSTRY; INFORMATION; NUMERICAL DATA