Published 1977 | Version v1
Report

Crossing geometry and the location of colliding beam areas

Description

Initial collider operation is anticipated in two long straight sections, with possible operation of a third region at a later date. The choice between regions B0--C0 vs B0--E0 must await a more complete design of the Tevatron machine and also requires detailed calculations of the machine parameters for each of these choices. The transposed schemes for bringing about collisions are more flexible and better adapted to colliding operation than the kissing geometry. Engineering studies indicate that the effort required for transposition is relatively small. The kissing geometry is less attractive and should be considered as a fall-back position, or for eventual use in a third area

Additional details

Publishing Information

Imprint Title
Colliding beam physics at Fermilab: interaction regions, beam storage, antiproton cooling, production, and colliding
Journal Page Range
p. 19-30.
Report number
CONF-7706150--P1

Conference

Title
Summer study.
Dates
Jun 1977.
Place
Aspen, CO, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
10473668
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM OPTICS; COLLIDING BEAMS; FERMILAB ACCELERATOR; GEOMETRY; STORAGE RINGS
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; MATHEMATICS; SYNCHROTRONS