Alignment of the Magnets for the Upgrade Project of the Straight Sections at the Photon Factory
- 1. Light Source Division, Photon Factory, Institute of Materials Structure Science, High Energy Accelerator Research Organization, KEK, 1-1, Oho, Ibaraki, Tsukuba, 305-0801 (Japan)
Description
For the upgrade project of the straight sections at the Photon Factory storage ring (PF ring), a reconstruction was carried out during the period from the 28th February to 20th September 2005. In this period, the installation of new quadrupole magnets and the precise alignment of the magnets together with the existing magnets were conducted using a laser tracker system and a leveling scope. As a result, the magnets were aligned with a tolerance of 100μm RMS for both of horizontal and vertical direction, and 200μm RMS for longitudinal direction. The precise alignment enabled us to realize the small closed orbit distortions (CODs) less than ±5mm without any corrections at the first stage of the beam commissioning
Additional details
Identifiers
- DOI
- 10.1063/1.2436016;
Publishing Information
- Journal Title
- AIP Conference Proceedings
- Journal Volume
- 879
- Journal Issue
- 1
- Journal Page Range
- p. 103-106
- ISSN
- 0094-243X
- CODEN
- APCPCS
Conference
- Title
- 9. international conference on synchrotron radiation instrumentation
- Dates
- 28 May - 2 Jun 2006
- Place
- Daegu (Korea, Republic of)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 39061308
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALIGNMENT; BEAM OPTICS; COMMISSIONING; CORRECTIONS; INSTALLATION; MAGNETS; PHOTON BEAMS; PHOTONS; QUADRUPOLES; STORAGE RINGS
- Descriptors DEC
- BEAMS; BOSONS; ELEMENTARY PARTICLES; EQUIPMENT; MASSLESS PARTICLES; MULTIPOLES
Optional Information
- Notes
- (c) 2007 American Institute of Physics